ISO/IEC 27001:2022 Annex A · Control 5.8
Information Security in Project Management: A Practical Implementation Guide
Integrate security decisions into project governance from initial idea through delivery and closure.
This control ensures that information security risks and requirements are considered within projects, regardless of project type or delivery method.
What should the control achieve?
- Projects are screened for security relevance.
- Security requirements and risks are documented early.
- Specialists and control owners participate at defined gates.
- Residual risks are accepted by authorized owners before launch.
Step-by-step implementation
Add security screening
Use project intake questions covering data, criticality, internet exposure, suppliers, new technology and regulatory scope.
Classify project risk
Apply simple criteria to determine the depth of review and required specialists.
Define requirements
Translate risks, policies and obligations into testable project requirements and acceptance criteria.
Assign responsibilities
Name the project manager, security reviewer, asset owner and risk owner.
Embed assurance gates
Review architecture, suppliers, testing, operational readiness and residual risk at suitable milestones.
Handover securely
Transfer documentation, risks, configurations, monitoring and ownership into operations.
What this could look like in practice
A CRM migration is rated high risk because it contains customer data and uses a new cloud supplier. Security requirements enter the backlog, Legal reviews the contract, architects assess integration, testers verify access controls and the business owner accepts documented residual risks before go-live.
| Activity | Practical implementation | Evidence |
|---|---|---|
| Project intake | Security screening determines review level. | Completed intake questionnaire |
| Design gate | Architecture and data flows are reviewed before build. | Approved design and action log |
| Go-live | Testing, monitoring, ownership and risks are verified. | Operational readiness checklist |
Implementation evidence
- Project security procedure
- Screening questionnaire
- Risk classification
- Security requirements
- Architecture reviews
- Supplier assessments
- Security test results
- Go-live approvals
Useful metrics
- Projects screened before approval
- High-risk projects with security representation
- Security defects found after go-live
- Overdue project security actions
Common mistakes
- Applying the process only to IT projects.
- Engaging security at the end.
- Using vague requirements that cannot be tested.
- Launching with unnamed residual-risk owners.
- Failing to hand security obligations to operations.
Questions an auditor may ask
- How are projects screened for security impact?
- Show security requirements in a current project.
- Who accepts residual project risks?
- How is secure operational handover confirmed?
Continue through Annex A
Explore the growing library of practical guides for all 93 Annex A controls.